View Single Post
Old 28-10-2005   #111 (permalink)
dynamite25
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Got the other side of the loft done yesterday with my mums help started at 12:30pm and finished at 17:30pm and i am really tired now but at least it's been done now,i am gonna board the sides of the loft hopefully at the weekend so it will be dust free also i need to finish boarding the roof up.


Were having sky lights fitted hopefully after christmas if we can find someone that won't charge to much to fit them.

Well stuff thats staying in the loft has been moved out of the way so i can board the end up and stick curtins along the side so we can still get stuff from the sides of the loft,and then i can move the sections up for that end of the loft then move all the stuff back over so i can do the other side.Once thats done all the stuff needs to be put under the layout so it's out of the way,so hopefully by next weekend i should be running trains thats if i get the other baseboards made up and in place to lay track on.
dynamite25 is offline   Reply With Quote
Sponsored Links