15-02-2006
|
#7 (permalink)
|
| Moderator
Join Date: Jul 2005 Location: Halifax, Yorks: Nassau, Bahama's:Port Canaveral, USA: and all points in between. Real Name: Richard My Models: Robbe U-47, Deans Marine Cossack, Steam Coaster, Revell U-Boat, Motorcycles. Visit Bunkerbarge's Gallery
Posts: 3,582
| As with so many of these bright ideas it has taken quite a bit longer than was anticipated to do this model.
I have now manufactured a base to mount the two motors and steering servo inside the centre section of the sub. I have installed an additional bulkhead to seal off the radio compartment at the aft end, just in case, and I now have the basics of the running gear installed.
I used brass shaft tubes for the 2mm steel shafts and aircraft control wires for the rudder servo linkages. I added supports for the servo wires and made a lead in to ensure the piano wire enters the rudder horns at the correct height.
All in all it is coming along nicely but, as I said, is taking a lot of time to do. I am now turning my attention to the rest of the electrical installation before getting the underside painted and the rest of the model completed. I have hacked around an aircraft battery to make a 7.2 V Ni-Cad pack which should assist will ballasting nicely and give plenty of run time for the two small motors.
I am extreemly pleased with the wooden deck set and the PE set from White Ensign models which have all fitted perfectly and have made a vast improvement on the stock kit.
Ballast is going to be a total of about 12-1300 grams minus the radio gear and running gear so I am anticipating requiring about 900 grams of lead sheet in the bottom of the model. |
| |