Finishing the front axel, the steering, and the wheel connections.
The drawing.
A lot of small rondells/tubes was to be made.
Some of the parts used for this first stage of the construction.
The bigger parts is wrapped around 0,5mm kartion and the strips are rolled against 2mm-1,5mm and 1mm
Part 39 is glued to the axels and the part with the rod is just put into place to see how it fits.
The wheel connectors.
The drawings
A lot of parts to be used on this operation.
First stage was the outer part.
It came out quite nice
The finished result.It still needs some paint.....
