Thread: Boiler build
View Single Post
Old 06-09-2007   #3 (permalink)
kevingambrell
Scale Model Member
 
kevingambrell's Avatar
 
Join Date: Dec 2006
Location: Crawley in Sussex
Real Name: kevin
My Models: I dont collect
Visit kevingambrell's Gallery
Posts: 175
Hi Alan
The final working pressure is defined in the design stage using hoop stress calculations to give the thciknes of material and the stay spacing.

The final pressure test is a hydraulic test to twice working poressure. thia is held for a defined amount of time whilst looking for pressure drop and deformation on the boiler. The last test is a live steam test to working pressure.

I tend to do these before the boiler inspector gets to the boiler.

Cheers Kevin
kevingambrell is offline   Reply With Quote
 
Problem Mortgage | Mortgage Loans | Loans | Pay Day Loans | Car Credit