Update time.
Over the last week or two I have fitted 3 of the 6 upper boards for the upper level but they will need to be removed to clean all the saw dust up and to wire the hidden sidings up but I will do that once I have got the other 3 fitted then I can do the whole end in one go,but I have two photos of the 3 boards that I have fitted and shows how much space I have for the upper level.
