I have updated the track plan for the upper level after I noticed some mistakes on it last night and now shows part of the lower level tracks and the second incline as I didn't leave any room for them when I did the right hand curve for the upper level so I have corrected that,I have also added the rest of the baseboards that are removable from the layout that have the mainlines and incline on them.
http://img.photobucket.com/albums/v6.../newdesign.png
Hopefully if I can get the tracks wired up in the hidden sidings this week I hope to start laying track on the upper level in 2 weeks time.