View Single Post
Old 09-04-2005   #28 (permalink)
dynamite25
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
To continue with the fiddle yard i have done some drawing on paint to show where the fiddle yard will go and ow to get trains from the main layout to the fiddle yard under the layout:

The first one is of the left side of the layout and fiddle yard
http://img.photobucket.com/albums/v6.../mylayout1.jpg

And the second one is off the right side of the layout with the train lift and fiddle yard

http://img.photobucket.com/albums/v6...my-layout3.jpg



Well the fiddle yard will have it's own controller to power the fiddle yard and when the lift comes down there will be some sort of contact strip to connect power from the fiddle yard to the lift,and when it is at the main layout level one of the main controller will put power to the lift via contact strips aswell, so the lift will only have power when it is at either level via the controllers.

Here's another drawing of it,i will do the proper drawings on paper anyway here it is
http://img.photobucket.com/albums/v6...my-layout5.jpg


Just done a quick drawing on paint program to show how the power will be connected to the lift
http://img.photobucket.com/albums/v6...connection.jpg

Last edited by dynamite25; 16-11-2005 at 11:13.
dynamite25 is offline   Reply With Quote
 
Online Advertising | Debt Help | Compare | Debt | Catherine Bell