Go Back   Scale Models > Modelling > Building The Red Baron

Notices

Reply
 
LinkBack Thread Tools Display Modes
Old 28-07-2005   #1 (permalink)
Moderator
 
wonwinglo's Avatar
 
Join Date: Apr 2004
Location: Warwick,UK
Real Name: Barry
My Models: Aviation artifacts
Visit wonwinglo's Gallery
Posts: 5,543
Thanks: 0
Thanked 0 Times in 0 Posts
Images: 49
Issue 82-Floor crossbars.

ISSUE 82-Floor brackets.

Issue 82 contains three transverse floor brackets each one of which differs,be careful to make sure that you araldite the three members correctly so do a dry run first,the only problem experienced was to open up one hole which was cast over and needed drilling out otherwise I am pleased to say there were no major obstacles to overcome.Before glueing the vertical longeron locators assemble the front bulkhead sliding the pre-glued floor/bulkhead assembly from the front and into the ends of the longerons.The photographs taken from the top and bottom below show how the assembly looks once into position.



__________________
'And there I was oil on my goggles from a broken pipe,then I looked at the altimeter,all I could see was the makers name !'
www.wonwinglo.scale-models.net/
wonwinglo is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Sponsored Links
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +1. The time now is 09:50.


Powered by vBulletin® Version 3.7.0
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
© 2004 - 2008 Scale Model Forums
Visit Computer Help 24/7
Bad Credit Loan | Daily Gadget Look | Online Advertising | Debt Help | Consolidation Loans

Hosted by Hawk Hosting ServInt Internet Services