• Log in
  • Results 1 to 8 of 8
    Chit-Chat Thread, How long is a piece of string...........? in General Chat; Well, its one of those types of question anyway. Typically speaking, how long do you spend on an average model? ...
    1. #1
      dd2356
      Guest

      How long is a piece of string...........?

      Well, its one of those types of question anyway.

      Typically speaking, how long do you spend on an average model? Most of mine (1:35 military stuff) take about 2 weeks each.
      Also, do you usually only have one kit on the go at a time?
      dd2356's Gallery
    2. #2
      Scale Model Member stona's Avatar
      Join Date
      Jul 2008
      Location
      Birmingham,England
      Posts
      5,797
      Thanks
      0
      Thanked 93 Times in 90 Posts
      If no major work commitment intervenes,causing time away from home I can knock a large scale plane out in three to four weeks. Many take longer but very few less. It obviously varies according to how well the thing goes together and how many alterations I make to the basic kit. Like you I only ever have one kit on the go at any one time. This means that the total input to the model in a 24hr period may be no more than a coat of Klear!
      I learned a long time ago not to give myself any deadlines,however spurious, as trying to meet them was always an invitation to Captain Cock Up and his merry men!
      Cheers
      Steve
      stona's Gallery
      Name:
      Steve

    3. #3
      Scale Model Member Fenlander's Avatar
      Join Date
      Dec 2009
      Location
      Peterborough UK
      Posts
      3,717
      Thanks
      4
      Thanked 30 Times in 29 Posts
      Country: England
      I have just measured a piece of string I found and the answer is 2' 3.5"! However, time is difficult to measure on a build. The 1:48 Mk IX spitfire was bought on a Saturday and finally finished the following Friday. How long I actually spent on it, I simply have no idea. The French Armoured carrier took a week and two days. If I had not spent so much time at work, on here, cooking, sorting out horrible (only kidding) kids, maybe three to four days less.

      An interesting question so long as the answer does not matter. A kit should take as long to build as it does, and no less. I have a couple of part built kits started in December bt I could not say it has taken three months to build them.

      I try to have one main kit on the go but I can happily demote it if something else comes along. The Eurofighter Typhoon I have on the go has been demoted by the French carrier and although very nearly finished, it has been demoted to secondary finishing while starting a new project. This, in the case of the typhoon, is simply because I have found it becoming boring and I don't want to rush it to completion and spoil it simply because I am bored. I would rather keep doing a little bit every now and again until it is finished. As well as that I have three other kits on the go, my horse drawn stuff which I really need to get back to soon.
      Graham
      Fenlander's Gallery
      Name:
      Graham

    4. #4
      dd2356
      Guest
      i did try to plan the build and paint, but i'd find that when tuesday came for first colour, i'd realise that i had missed something and needed to do that first. So now i go with the flow. The current self propelled howitzer giant has taken 2 weeks so far. But i'm determined not to rush it, as the detail looks so good, and i want to make this my best so far.
      It seems more difficult because of the fact that i can't cover this one in rust and mud to hide any cock ups i might make!!
      dd2356's Gallery
    5. #5
      Scale Model Member stona's Avatar
      Join Date
      Jul 2008
      Location
      Birmingham,England
      Posts
      5,797
      Thanks
      0
      Thanked 93 Times in 90 Posts
      Quote Originally Posted by dd2356 View Post
      It seems more difficult because of the fact that i can't cover this one in rust and mud to hide any cock ups i might make!!
      Better stay away from aircraft then LOL
      Steve
      stona's Gallery
      Name:
      Steve

    6. #6
      Scale Model Member Richy C's Avatar
      Join Date
      Nov 2009
      Location
      Banstead , Surrey , UK
      Posts
      1,081
      Thanks
      0
      Thanked 5 Times in 5 Posts
      Country: England
      Having 2 little ones it takes me months to finnish anything, at the moment I`ve got an Ardennes dio 70% done and a 1/48 spitfire 80% done and a load of armour and figures primmed ready to go ,with a bit of luck they might get finnished by christmas LOL,

      Off work tomorrow and Saturday so will try and get a bit more done, Sunday is a no no with my sons football , the Grandprix , and Mothersday.

      Trouble is I keep getting more ideas and buying things (happy days) also I spend more time on here than I do actually making the things ( getting my scalemodel fix )

      Richy
      Richy C's Gallery
      Name:
      Richard

    7. #7
      GB+SIG Mod. Ian M's Avatar
      Join Date
      Dec 2008
      Location
      Greve, Denmark
      Posts
      6,393
      Thanks
      25
      Thanked 255 Times in 248 Posts
      Country: Denmark
      Thats a long bit of string you unravelled there, double D!
      Lets just say I have been building a Corvette; HMS Bluebell and that is getting to be well over 18 MONTHS since the start. On the other end I have a little DKW NZ350 motor bike that took a weekend! Most things between 2 weeks to a month.
      Ian M's Gallery
      Name:
      Ian

    8. #8
      Super Moderator yak face's Avatar
      Join Date
      Jun 2009
      Location
      sheffield , england
      Posts
      4,059
      Thanks
      194
      Thanked 157 Times in 157 Posts
      Country: England
      Mine can vary enormously depending on a few different factors. At the moment the cold weather is putting a stop to modelling as i model in an unheated outbuilding(well ive got a halogen heater but it doesnt make much difference when it below freezing). The 1/76 wespe i recently did was done in about a week and a half but because its so small i could fetch a cutting mat with everything on into the house ,and did it in the warmth!!The other thing that can affect the time is the size /complexity of the plane, a 1/72 scale fighter can take a couple of weeks but the 1/32 mig 17 took 3 or 4 months and the 1/32 beaufighter ,due to the scratchbuilt interior and extra detailing to the cockpit/ engines and wheelwells took about a year!! On the second point i usually have 2 or3 on the go at the same time. Cheers tony
      yak face's Gallery
      Name:
      tony

    Bookmarks

    Posting Permissions

    • You may not post new threads
    • You may not post replies
    • You may not post attachments
    • You may not edit your posts
    •  

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150