Go Back   Scale Models > Trains > Layouts & Pictures

Notices

Reply
 
LinkBack Thread Tools Display Modes
Old 18-01-2006   #141 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Now that i got most of the things need to get my layout up and running so from tomorrow till sunday night i am going to get done the following things.

1)To get all lower baseboards in place and the rest of the roof boarded up
2)Get all lower track work in place and pinned down
3)To fit all points motors for the lower level and have wires off them into a wire blocks ready to completely wired up
4)Start to work on upper level
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Sponsored Links
Old 19-01-2006   #142 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Have decided that while i am building the layout is to wire it ready for DCC as i will be changing over later this year but still be able to use DC control till then,it will make it easier to do it now than later when all track is layed and ballasted.
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-01-2006   #143 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Well i have manged to finish boarding one side of the loft up today and i will do the other side tomorrow afternoon as i am building a wardrobe in the morning for my sister,but before i start the boarding up of the rest of the other side of the loft i will cut the other basboard and fit it in.

Then saturday after food shopping and get supplys for the layout i will start laying track down,i'm gonna try and get the lower level done by saturday night if nothing else crops up.
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 22-01-2006   #144 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Well i have decided to stick with DC control as that seem far easier to me as i just connect two wires from each of the 5 controller to each loop and to my depot area and away i go controlling my trains.


And what wire i bought can be used to wire extra lighting in the loft.

Last edited by dynamite25; 22-01-2006 at 06:28..
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 23-01-2006   #145 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Well i have ordered 6 100m reels of wire for my layout from www.rapidelectronics.co.uk and cost £5.17 inc vat each and for all 6 £31.02,and i have also order the new hornby cat aswell as two track plan books,two packs of hornby track pins and 12 PL 12 Motor Adaptor for the PL10 point motors from hattons.
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 24-01-2006   #146 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Well i received my wire today at 10:15AM which is great service really as i thought i would get them tomorrow,but i got them today just waiting on items from hattons now.
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 01-02-2006   #147 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Well i got my things from hattons today so i'll be starting my layout this weekend and i might use some of the ideas form the track plan books i got today on my layout,also going to buy one or two packs of cork tiles so i got some more full tiles for station area.
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 03-02-2006   #148 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
I have had a redesign of the station area and storage fiddle yard area under the station have a look and tell me what you think,also there are some parts that aren't the same in both pics.



Station area

http://img.photobucket.com/albums/v6...ovedlayout.jpg


Fiddle yard

http://img.photobucket.com/albums/v6...vedlayout1.jpg
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 06-02-2006   #149 (permalink)
Mad Modeller at large
 
dynamite25's Avatar
 
Join Date: Oct 2004
Location: CHESHIRE,UK
Real Name: steven
My Models: R/C Nitro/Electric Cars,Boats and Model Railways,Scalextric
Visit dynamite25's Gallery
Posts: 515
Made another order to hattons for 12 hornby points 2 L/H and 10 R/H i also ordered another track plan book and i need another 2 points aswell as the points i ordered today,but i will get them from my local model shop when i get paid again in two weeks as i only had enough money to buy the 12 points and the track plan book today.

Also not been beable to get anything done today as my parents had to nip out so i had to stay down stairs with sam till they came home but by time they did it was to late to go into the loft to make a noise,so maybe tomorrow but they might be going out tomorrow aswell to chester so maybe Wednesday now.But i need to get atleast the roof done tomorrow but we will see what happens.
dynamite25 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 06-02-2006   #150 (permalink)
R.I.P. Respected Member
 
Nigel.D's Avatar
 
Join Date: Sep 2005
Location: Basildon Essex
Real Name: Nigel
My Models: All sorts
Visit Nigel.D's Gallery
Posts: 787
Images: 35
Steven this is really interesting but i dont understand a lot any chance of a beginners guide to railway layouts please also the benefits and probs between n and 00 guage?? cheers mate im looking to build a railway for my youngest but dont know where to start??
Nigel.D is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Bookmarks

Tags
layout , making

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT +1. The time now is 01:51.


Powered by vBulletin® Version 3.8.0 Beta 2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
© 2004 - 2008 Scale Model Forums

ServInt Internet Services