Not posted for a while as I have not been feeling up to working on the layout but today I went up into the loft to sort a section of the layout out which is the section where the hinged section is,because over the last couple of months I have come to a decision that I won't be able to clean the tracks the way I was going to do with the hinged section above the upper level.
So now I have decided to have that section of the upper level hinge up aswell as the hinged section that attachés to it so I can lift the whole lot up to clean the tracks below and fix any train,all other sections will have cutouts where buildings will be so they can be lifted out to gain access to the lower tracks.
Here is a picture of that section with all the upper level supports removed ready for the new hinged upper level to go in which is 6ft long.
