Work has restarted on the layout with point motors being fitted in the hidden sidings just a few more to go but need to order a couple more point motors and fixing plates,also I ordered the track for the upper level now that I have a track plan that I am happy with for the upper level and I got the track today from hattons.
And this is the track I ordered.
1 * Peco Model Railway Products SL100/B Box of 25 * 1 yard (91.5cm) lengths of Wooden-sleeper nickel silver flexible track.
2 * Peco Model Railway Products LK56 Loco inspection pit for normal code 100 track
4 * Hornby Model Railways R601 Double Straight
3 * Hornby Model Railways R606 2nd Radius Curve
3 * Hornby Model Railways R608 3rd Radius Curve
4 * Hornby Model Railways R614 Left hand diamond crossing
2 * Hornby Model Railways R615 Right hand diamond crossing
11 * Hornby Model Railways R8072 Left Hand Standard Point
1 * Hornby Model Railways R8073 Right Hand Standard Point
And here are two photos of the Track and I forgot to put the track in the second pic with the other track in the first so I had to take another.
And here is my track plan I have done and I have added the two buildings and fueling point in the TMD,and platforms in the station which there is three also the red bit is a brick wall and the long brown bits are the 3x6 beams in the loft .
http://img.photobucket.com/albums/v6...te26/new31.png