| Putting the Air Warriors B-29 together. Previously we showed the kit parts all crammed into the box,just to show you what real value you get here are the contents laid out on my workbench.
First job is to screw the lower wing strap complete with the miniature power eggs in place,all of the wireing traps neatly in the leading edge and exits via a single plug which is connected to the fuselage,just make sure the wing seats firmly in place and that all motors have the same amount of downthrust incorporated,if not then remove the screws securing the upper cowls and adjust the motors in their mountings by backing off the screws and wiggling downwards.
The tail fin sits nicely between a small bracket and a screw goes right through the lot.
In fact the most difficult job is placing the decals in position around the cockpit area as each window is applied in turn to give that characteristic look of this awesome bomber.
Charge up the small battery pack and install,enjoy the sound of four motors at full chat on the test run.
Next we will deal with the test flight and how she handles.
__________________ 'And there I was oil on my goggles from a broken pipe,then I looked at the altimeter,all I could see was the makers name !' www.wonwinglo.scale-models.net/ |