Frame basecoated ( & tank dry fitted ). Engine assembled, just the leads/pipes to add before fitting into the frame
Might be a bit of a juggle, getting all the bits to fit between the frame halves!
Dave
Still having hand problems, but managed to fit the engine & assemble the forks
I used True Metal on the forks - it needs a bit more work to improve the finish...............
Dave
These will be last pictures posted in the 'under construction' section. Not a lot of parts to add, decals & detail painting & the last of the cables........................
Those oil pipe to the cooler are a real b****r to fit!
The tyre rubber is very soft & seems to scuff easily - I'll have to see if I can even the colour out somehow.
Dave