SteveH
SMF Supporter
- Joined
- Apr 28, 2018
- Messages
- 1,293
- Points
- 113
- First Name
- Stephen
Don’t sweat it Bob. I’m sure you have an A or A2 in the stash, so when you get around to them you already have half the tracks done!
Just what I was going to say as positive reinforcement.
There is always another Stug so there will always be more tracks to be built.
Try the ""measure twice, cut once""" mantra, to help with your mental foggyness, and perhaps reinforce that with a build log of the changes/upgrades as a tick list.
Enjoy the build and the better days when plastic gets cut and glued
Regards
Steve H