Build the Titanic a part work. 1\250 scale

Jon Heptonstall

SMF Supporter
Joined
Apr 30, 2018
Messages
1,193
Points
113
First Name
Jon
That looks fantastic! The dazzle idea was good but I think I prefer the standard finish.
excellent job on the hull planking too.
Jon.
 

peterairfix

SMF Supporter
Joined
Jul 19, 2012
Messages
7,295
Points
113
Location
Taunton
First Name
peter
And talking of my build here's a small update I have decided on building some a new parts and the first of the new parts will be the first and second class gratings that cover the domes using the magazine supplied template and a new hatch cover for the forward deck still work to do on them but here's what they look like so far.WP_20181118_09_29_41_Pro.jpg
 

peterairfix

SMF Supporter
Joined
Jul 19, 2012
Messages
7,295
Points
113
Location
Taunton
First Name
peter
I have now finished the gratings and ready to install them in their respective places but have to remove the old second class grating.WP_20181119_15_04_34_Pro.jpgWP_20181119_15_05_30_Pro.jpgWP_20181119_15_19_20_Pro.jpgWP_20181119_15_20_55_Pro.jpgWP_20181119_15_27_47_Pro.jpg
 

peterairfix

SMF Supporter
Joined
Jul 19, 2012
Messages
7,295
Points
113
Location
Taunton
First Name
peter
Done a bit more this time it's transferring the bridge structures over and the ships wheel and compass along with the telegraphs.
And also I have replaced the dome gratings with plastic to give a neater appearance.
And I have refitted the bow anchor.WP_20181201_15_11_50_Pro.jpgWP_20181209_13_25_30_Pro.jpgWP_20181209_13_53_06_Pro.jpgWP_20181209_13_25_53_Pro.jpg
 

peterairfix

SMF Supporter
Joined
Jul 19, 2012
Messages
7,295
Points
113
Location
Taunton
First Name
peter
While waiting for my spitfire to dry I picked up the two ships and started transfering some parts over from the doner ship it's mainly railings and vents four cranes from bow and parts on the fore deck.20190416_153208.jpg20190416_153218.jpg20190416_153234.jpg20190416_163956.jpg
 

Attachments

  • 20190416_163956.jpg
    20190416_163956.jpg
    102.1 KB · Views: 0

peterairfix

SMF Supporter
Joined
Jul 19, 2012
Messages
7,295
Points
113
Location
Taunton
First Name
peter
Time to change scales I am back on my bigger Titanic I have almost finished the bow just a few bits to do and I have the first mast on and the first two funnels fitted.20190812_151441.jpg20190812_151513.jpg
 
Top