CHOSIN FEW at Funchilin pass

scottie3158

SMF Supporter
Joined
Apr 27, 2018
Messages
12,525
Points
113
Location
Spalding
First Name
Paul
Greg,
Firstly apologies for not keeping up with this I have missed a few updates. I have to agree with the others the work on the terrain is superb especially the rain channels. Keep up the great work
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
Thank you Paul you don't have to apologise...it's great that all of you follow me and my work... it really boosts me to do better/more.... ;) :smiling:
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
Today’s work electrical panel... grass and 2nd layer of paint..
13AE1D9C-64DD-4547-965E-EAE2AE70153C.jpeg27D3AA82-E755-44AE-9A38-1CF18C35945B.jpeg661F7B04-15AE-43DA-8C2E-991F4DF928B1.jpeg4497AC08-A04C-4A9D-B2E6-D1B1B2E6A4D3.jpeg
 

Si Benson

SMF Supporter
Joined
Apr 27, 2018
Messages
3,310
Points
113
First Name
Si
Excellent work Greg....I’m loving the road, looking superb :thumb2:
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
Thank you Si... and the others
Today’s work color on the building and the interpretation of the color and the camoE7BF3AFE-30DA-49CD-BB55-D281CEA7B42A.jpegBB575E54-A007-4ADD-88BA-61DC5B1C0C4E.jpeg
 

Steve Jones

Steve Jones Scale Modelling Site
Joined
Apr 27, 2018
Messages
6,698
Points
113
Location
Plymouth
First Name
Steve
Keeps on getting better Greg. Remind me, will there be a pile of wood or stone at the end of the road to represent the left overs of the bridge??
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
Good evening gents... today’s work... damage on the wall, placing of the windows and first layer of the snow on the roof... l’m working also on the korean panels...9FC7B9EF-EB4E-4216-B5D6-2B53ED8FAC1C.jpeg
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
Keeps on getting better Greg. Remind me, will there be a pile of wood or stone at the end of the road to represent the left overs of the bridge??
Hey Steve ... thank you and yes there will be rubbles and the wood structure that the engeneers made to « support » the treadway bridge..
 

Jim R

SMF Supporter
Joined
Apr 27, 2018
Messages
13,595
Points
113
Location
Shropshire
First Name
Jim
Hi Greg
As Scottie says this does indeed get better and better.
Jim
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
There u go... today’s work... the windows were placed and corrected (gaps were filled) also the propaganda writings (since my picture was in black and white l decided to go as the North Koreans do with red and white) added dead leaves on the ground and i did a light white airbrush to simulate where the snow will go.... and finally the s’ow on the roof..573B4D1C-ADA3-4B0C-BC5B-BDE329F86FBB.jpeg62D2AABE-889F-46E3-8DF0-15473A71CFBF.jpeg4CD67CC4-4D77-4D1A-9BDC-917741235DA5.jpeg
 
D

Daniel Horvath

Guest
Stunning progress Greg its really coming together! Beautifully detailed as all of your work ! Regards Danny
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
Thank you Dan hope you had a wonderful vacation...and concerning the Diorama... l'm having a blast...:smiling::smiling::smiling::smiling::tears-of-joy::tears-of-joy::tears-of-joy:
 

BigGreg

SMF Supporter
Joined
Apr 27, 2018
Messages
2,039
Points
113
First Name
Gregory
Hey Paul... :smiling: thank you.. i'm using Polyfilla plaster the white one... it's easy to place and you just need water to work it.. BUUUT it dries very fast...
 
Top