HO 80s/90s CSX, NS, & Conrail layout resurrection.

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Highlines are nickel & old or lightly used sidings are brass rail. All are 100#. PaulE
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Progress pics. Control panel/old station section 'dry fit'.
100_1997.JPG
AAAHHHRRRGGGG! Something has changed. Attachment holes are not aligning on the left. Cave remodel must have changed environment.
100_1996.JPG
100_1995.JPG
C&Cs welcomed. PaulE
 

Mini Me

SMF Supporter
Joined
Jun 1, 2018
Messages
10,159
Points
113
First Name
Rick
I'm with you on that Paul. No fun "Crab Walking" under the bench work chasing loose connections. BTDT!
Rick H.
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
No need to panic. Industry yard section was hung up on wiring terminal block. SWMBO's b'day Sat. so no benchtime to keep the peace.
Testing may begin Sun. PaulE
 

boatman

SMF Supporter
Joined
Nov 8, 2018
Messages
12,876
Points
113
Location
NORFOLK UK
First Name
christopher
The Very Best to your missus and I hope you have a great time celebrating! Rick H.
An the same from jen an I wish your wife a very happy B-day an have a good time
PaulE an im lookin forward to when you fire up the railway hope it all geos ok
QUESTION are all the rail lines live or are they only live when you throw the points to that rail only ? as on my layout for that zero 1 all rails were live's an return's as the loco had a computer chip fitted an would only go when I programmed in the loco's no. in to the computer an then it would send a digital signal through the track to tell that loco to move an all the other trains wont go until I again fed in to the zero1 unit another loco no. an that one would move too it was a good idea an system if only Hornby had made the system more powerfull
jen an chris
 
Last edited:

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Thank you. I use the old DCV block system where all rails are live unless the block they are in is turned off, so only one train at a time unless your trains are tuned alike in speed or load is tuned to match train speeds. This is pretty dodgy, but I have done it for short periods on the previous large dbl. dogbone layout. PaulE
 

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
Just gets better and bigger Paul, hope there is a grand opening for all to see !
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Sat. was dinner & a movie. Sunday we binged Homeland's 5th season, so no testing. Well, testing Monday did not go well. Intermodal sections passed fine, actually test ran a few locos. Large industrial section has a dead short somewhere & brought the controller down. I'll have to pull up that module & bench troubleshoot it. Rather than take an axe to the whole thing, I started constructing some tanker kits that were in the WIP box. Merry Christmas to all. PaulE
 

Lee Drennen

Box Stock Builder with a Twist/ Rabble Member
SMF Supporter
Joined
Apr 29, 2018
Messages
5,640
Points
113
Location
Wortham Mo
First Name
Lee
Merry Christmas Paul I like the chassis stacker
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Thanks, don't know where the prototype pics went, but that's what I modeled it after. PaulE
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
These took about 3hrs apiece to get to weather stage shown here w/metal couplers & wheelsets added & tuned. Found model kits of hotbox sensors & loose/dragging stuff sensors plus some nice relay boxes by Details West. Pics to follow.
100_1999.JPG
PaulE
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Control section work progresses. Abandoned station/water tank now open market on weekends. Relay boxes, hot box sensors & alert light, dragging sensors & warning light, turnout motors & battery boxes installed. PaulE
100_2006.JPG
100_2005.JPG
100_2001.JPG
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Ind. module back up for troubleshooting.
100_2014.JPG
Some track damage causing short due to aligning upper level w/o checking lower. Duh! Will continue checking.
100_2016.JPG
Needed fencing to keep out civilians.
100_2013.JPG
Christmas present. Lotsalitlparts.
100_2012.JPG
 

Mini Me

SMF Supporter
Joined
Jun 1, 2018
Messages
10,159
Points
113
First Name
Rick
From here it looks like a Pullman Standard Hopper car, 100 ton cap. maybe?
Peers you are having fun...hope you get the electrical sorted soon. Rick H.
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,714
Points
113
Location
Dayton, OH
First Name
Paul
Good eye Rick, PS2-CD High-Side Covered Hopper by Life-Like Products, Proto 2000. Still procrastenating on the Ind. module testing. PaulE
 

adt70hk

I know its a bit sad but I like quickbuild kits!!!
SMF Supporter
Joined
Sep 4, 2019
Messages
9,491
Points
113
First Name
Andrew
Paul

As always this brings back memories of my modest layout. Good luck with the continued reconstruction..

All the best. Andrew
 
Top