Evening, don't know where you are but the winds got up again.Lovely sunny day after a wet morning.
Right moving on, started on the dowel, to make things quicker I inverted my 100mm belt sander and thinned down the dowel.
Then rinsed in water, to lift the grain and dragged the saw down the length, gives a reasonable bark texture.
These will be de -nibbed once dry with a light sanding.
As the ammo cases arrived yesterday i'd made a start on the boxes. Nice clean moulding, the
decals are so small , so will have some fun, but iv'e used them before with success.
Bit of over glue, think I need to use a much smaller brush for this sort of kit, may be an old No 7 .
Several weeks ago I glued up a section of insulating foam to a ply base, left it with weights on. Today started the shaping. I wanted to have some high at the back, so to increase this I removed about 30mm from some of the base.
Marked out and numerous cut made into the foam at the depth of a Stanley knife blade.
Then cut another section to give the total high, with a smaller piece on the left.
That last piece will be glued later, but first the main part.
UHU for foam applied each side, then rubbed joined to remove any air and to spread the glue out weights and pins were applied.
Just to give an idea of where the truck and SU will be.
Thanks for looking in, comments welcome.