Jim R
SMF Supporter
Hi Graham
Simply stunning. To build up all that etch so neatly is a credit to your skill and patience.
Jim
Simply stunning. To build up all that etch so neatly is a credit to your skill and patience.
Jim
ThanksGreat metal work. Shaping up beautifully. Donald Duck appreciated. PaulE
ThanksHi Graham
Simply stunning. To build up all that etch so neatly is a credit to your skill and patience.
Jim
Graham, the cross shaped bit in the centre of the raised deck/platform in the middle photo needs cutting out it is a part needed for later.The bridge is now ready for spraying. These photos show just the bits I have built. There is still a lot of PE and white metal bits to fit. This is all dry fitted. Most of the parts are soldered together.
View attachment 325421View attachment 325422View attachment 325423View attachment 325424View attachment 325425
Thanks, The assemblies in the pictures are made from a 2nd bridge set, as I had a disaster with some of the parts I'd built from the 1st set; I managed to crush some of the assemblies. So I already have this bit cut out and made from the 1st set.Graham, the cross shaped bit in the centre of the raised deck/platform in the middle photo needs cutting out it is a part needed for later.
I hope you haven't closed it in yet.
For FULL Forum access you can upgrade your account here UPGRADE