T
tommy1drop
Guest
I've been building this beauty, as I have put the breaks on the two Bussing Nags that are on the go, this is because they are awaiting some paint :rolleyes:and I'm waiting for my spray booth to arrive
Anyway this is the Italeri M1120 Hemtt load handling system, I have had this particular kit starring at me, so I thought whilst I'm waiting :rolleyes:
It's a nice kit to build, goes together with no fuss, and the one thing that you notice, is the size of thing:eek:
I was toying with the idea of putting a Husky on the back of it, but after asking Ade for the Husky's measurements, I now think that it won't fit:eek:
Anyway this is where the build is at the moment, and I really hope you like it.
Anyway this is the Italeri M1120 Hemtt load handling system, I have had this particular kit starring at me, so I thought whilst I'm waiting :rolleyes:
It's a nice kit to build, goes together with no fuss, and the one thing that you notice, is the size of thing:eek:
I was toying with the idea of putting a Husky on the back of it, but after asking Ade for the Husky's measurements, I now think that it won't fit:eek:
Anyway this is where the build is at the moment, and I really hope you like it.