Yes this will be a second go as my first one didn't turn out as expected but this time I have the full PE set witch will take the parts count to about 1000 pieces.
Wish me luck.
Time for a Start first up is the hull I have the two halves together and the area around the prop shaft needed filling and sanding and smoothing down
And the rudders are fitted all is ready for masking and the first coat of paint.
Time to start on the many small parts and they will all need pe in some form first up is the two arado's one has just been done and has the prop replaced with a pe one
Had a go at doing one of the main turrets and all the PE and to give you an idea how small some pieces are the small hand holds measure 2mm by 1mm.
Only three more to do
The four main turrets are finished and most of the small pe won't be used as it's far too small for me.
And I have drilled out the gun barrels to give a bit more detail.
Plus the deck has got some colour.
Time for a change of ship this time round I have been making up more bits and pieces and the two deck cranes all come with some more pe and all to go into storage unit installation