Hi Ian I was thinking of a full year build for this GB if it gets off the ground\ said:The idea of a 1/24 scale GB is not a bad idea at all.However as Paul pointed out with the dead line bit, I think 3 months could be a bit tight. Maybe a SIG for six months, so most can follow.
Or we could go all out and throw everything at it and have it as a Super GB. I am sure that we can all keep up over a whole year. With that kind of time frame I would expect to see some super detailed builds.
Ian M