Good progress by the looks of things Tony.
Thanks John, have started laying track, points and two cross overs , double slip and single slip, the double slip is access to platform two and the middle track, the single slip
is access to the middle track from the station module to shunt around the Indian Pacific at East Perth terminal the end of IP's journey from Sydney, extra fun .
On the loop and station modules triple track
When the IP arrives at Sydney depending on if the train has 28 passenger cars , has to split up onto the island platform 2 and 3, when I complete the layout the curved approach module, if only has 18 cars will arrive platform one, I am not sure if I will motorise the cross overs , be on my toes then.
If I have some friends over for a running day, I will need a chief controller, hopefully my wife .
Before I can nail the curved track down, I have to cut a 6 inch ply piece so I join up the two modules, that be Fridays job and the same the other end, that way the track will line up every time .
Tony from down under, starting to warm up 29 degrees now, quite warm working at the side of the house, might set up my gazebo up