HO 80s/90s CSX, NS, & Conrail layout resurrection.

boatman

SMF Supporter
Joined
Nov 8, 2018
Messages
13,036
Points
113
Location
NORFOLK UK
First Name
christopher
HI PaulE lookin good that layout is very well done an have you got eletric points or switchers as you over the pond call them ? as i had 40 sets of eletric points but they were not reliable
chrisb
 

boatman

SMF Supporter
Joined
Nov 8, 2018
Messages
13,036
Points
113
Location
NORFOLK UK
First Name
christopher
HI PaulE DONT you have white lines in rd centre like we do on most of our rds ? an can i see a shot of your controll panel where you work everything from as with my layout i had a ZERO 1 computer to controll the trains an a micromimic signal box to controll the eletric points but was not relabile
chrisb
 
Last edited:

adt70hk

I know its a bit sad but I like quickbuild kits!!!
SMF Supporter
Joined
Sep 4, 2019
Messages
9,526
Points
113
First Name
Andrew
Coming on very nicely indeed Paul!
 

minitnkr

Rabble & escape committee member
SMF Supporter
Joined
Apr 27, 2018
Messages
6,755
Points
113
Location
Dayton, OH
First Name
Paul
Much progress. Curve fully blended.
100_3992.JPG
Proposed south end blend.
100_3993.JPG
Finished trees from assembly line for thickening the Ukraine Ambush dio. as well as RR extension.
100_3994.JPG
Third extension waiting for legs.
100_3995.JPG
 

Jim R

SMF Supporter
Joined
Apr 27, 2018
Messages
13,867
Points
113
Location
Shropshire
First Name
Jim
I'm really impressed Paul. Seeing this coming together makes me realize what a huge amount of work goes into these railway layouts. Then there's the electrics on top :smiling:
 
Top