HI PaulE lookin good that layout is very well done an have you got eletric points or switchers as you over the pond call them ? as i had 40 sets of eletric points but they were not reliable
chrisb
HI PaulE DONT you have white lines in rd centre like we do on most of our rds ? an can i see a shot of your controll panel where you work everything from as with my layout i had a ZERO 1 computer to controll the trains an a micromimic signal box to controll the eletric points but was not relabile
chrisb
Like this one? Not all roads are marked.
Block & turnout controls. These will need to change as lower level, some turnouts and blocks have been removed.
Much progress. Curve fully blended.
Proposed south end blend.
Finished trees from assembly line for thickening the Ukraine Ambush dio. as well as RR extension.
Third extension waiting for legs.
I'm really impressed Paul. Seeing this coming together makes me realize what a huge amount of work goes into these railway layouts. Then there's the electrics on top