Undercarriage is on , ready for the U/C doors , control surfaces have had a wash applied and the cannons in the booms have been drilled out. The cannon in the nose has been replaced with brass tubing and the landing lights in the boom fronts have been drilled and painted silver , ready to have a drop of Kristal Klear aftermatt varnishing.Ive also painted the canopy frames on the 2 separate parts ready for fitting last off. Next job U/C doors and matt coat then its nearly there , cheers tony