While waiting for stuff for the dozer I thought I would have a look in here.
And very interesting it looks too.
The brown sprues are for the tracks, each sprue has 60 parts, and there are 6 sprues, so that will take an hour or two.
Nice clear instructions and paint guide, 2 sheets of PE, 3 rubber tyres and a bit of string presumably for the winch, some decals and an optional canvas tilt. I should have the dozer done tomorrow so this will be next in line
Andy.
And very interesting it looks too.
The brown sprues are for the tracks, each sprue has 60 parts, and there are 6 sprues, so that will take an hour or two.
Nice clear instructions and paint guide, 2 sheets of PE, 3 rubber tyres and a bit of string presumably for the winch, some decals and an optional canvas tilt. I should have the dozer done tomorrow so this will be next in line
Andy.