dynamite25
Mad Modeller at large
- Joined
- Oct 1, 2004
- Messages
- 443
- Points
- 18
- First Name
- steven
Well the 3ft side is done apart from some more screws that i need to put in to hold the boards down,i've un-soldered the track ends on the other boards so i can connect new track up.
I should have the left side completed sometime tuesday or wednesday and then i can lay some track down on the lower level,i also need to buy two sheets of 3mm ply for the upper level as i only got enough for the other parts of the layout apart from the station area so i need some for there but i will get that in 2 weeks when i get paid.
I will have some piccys of the layout tomorrow as i am completely knackered from working hard on the layout since yesterday,i've changed the framework slightly to give me an extra 6" to make it 2ft x 2ft 6" on the right side of the layout.
I should have the left side completed sometime tuesday or wednesday and then i can lay some track down on the lower level,i also need to buy two sheets of 3mm ply for the upper level as i only got enough for the other parts of the layout apart from the station area so i need some for there but i will get that in 2 weeks when i get paid.
I will have some piccys of the layout tomorrow as i am completely knackered from working hard on the layout since yesterday,i've changed the framework slightly to give me an extra 6" to make it 2ft x 2ft 6" on the right side of the layout.