Time for an update
With the balconies fixed it’s time to add detail to the damaged parts.
As per usual I add a mix of celluclay and small pebbles and mortar to the broken surfaces and sprinkle further mix of different grades of crushed mortar, before adding the rebar irons (twisted 0.2mm fusewire).
The story of the side part of the wrap-around balconies is that the upper has bee struck by Mortar/artillery fire and also the aerial bombing that completely devastated the building. It has partlycollapsed and the fallen debris has destroyed the part of the lower where the ornamented part was.
I have finished the upper part but have not arranged the rebar yet – it will be mangled, twisted etc
Still lots to do – there’s a lot of broken concrete and rebar in this dio…. .
Things I am happy with: – parts of the corner dangling….
Less happy: The tiles are a 3-d cardboard from Reality In scale and I find it difficult to make the broken areas,- well, realistically broken…