dynamite25
Mad Modeller at large
- Joined
- Oct 1, 2004
- Messages
- 443
- Points
- 18
- First Name
- steven
Here's some photos of the new baseboard between the two 6x4 ones with some track on it the track in the photos is for the diesel depot and paint shop.
in this one is all my stuff for the layout
On the 6x3 baseboard the ply sheets still need to be screw down as there are only 4 screws in it to hold it in place.
in this one is all my stuff for the layout
On the 6x3 baseboard the ply sheets still need to be screw down as there are only 4 screws in it to hold it in place.