Dzhon's KV2 Trumpeter 1/35 SCALE

adt70hk

I know its a bit sad but I like quickbuild kits!!!
SMF Supporter
Joined
Sep 4, 2019
Messages
9,496
Points
113
First Name
Andrew
No complaints from me John!!
 
  • Like
Reactions: JR

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
Outstanding mate! Wonderful contrast of colours. Very realistic work. Keep it comin my friend
Thanks Steve, lost it a bit with the recent attack on the Ukraine, although a different date still feels wrong to have an interest in Russian armour.
No complaints from me John!!
Thanks Andrew.:thumb2:
 

Mini Me

SMF Supporter
Joined
Jun 1, 2018
Messages
10,160
Points
113
First Name
Rick
No sweat JR.....that is all the bomb! It isn't Rooskie armor that is the problem....just think, I got the triple whammy!! I have two of Stalin's hotrods under construction plus a Rooskie Chopper for Peter's GB! :tongue-out2: Rick H.
 
  • Like
Reactions: JR

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
No sweat JR.....that is all the bomb! It isn't Rooskie armor that is the problem....just think, I got the triple whammy!! I have two of Stalin's hotrods under construction plus a Rooskie Chopper for Peter's GB! :tongue-out2: Rick H.
Thanks for that Rick, appreciated.
 

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
2022_8.jpg2022_9.jpg

Yes binned, why you shout. Well I cut some plastic and using silicone applied the sheets cut to length, glued them to the sides. Mixed up the "water" and it leaked out. :poop::poop::poop::cold-sweat::angry::worried::sad::flushed::confused:

These things happen, not pleased as you can imagine, but as the water left on the base had failed to dry as well I decided to remove the whole base from the subbase and start over afresh.

No bridge, just some filler a dip in the center (note the Mod podge recently purchased) some ice sheet and a lone KV deserted in the snow.

Thanks for looking in, comments welcome.

John.:smiling3:
 

Jim R

SMF Supporter
Joined
Apr 27, 2018
Messages
13,726
Points
113
Location
Shropshire
First Name
Jim
Hi John
Rather shocked as you excel at this sort of thing. Having said that these things happen. Looking forward to the mk2 base which will no doubt be a stunner.
Jim
 
  • Like
Reactions: JR

David Lovell

SMF Supporter
Joined
Apr 27, 2018
Messages
1,496
Points
113
Location
Poole Dorset
First Name
David
Bit of a bummer but know you well enough now to bounce back a pain after all the hours but hey from the ashes and all that. Dave
 
  • Like
Reactions: JR

Neil Merryweather

SMF Supporter
Joined
Dec 29, 2018
Messages
4,424
Points
113
Location
London
First Name
Neil
Oh dear :tired: I was having a very enjoyable catch-up and getting all excited!
And now this!
The remains of the bridge looks fine as it is-hope you can incorporate it somehow.
Top stuff, John, in spite of the set-back!
 
  • Like
Reactions: JR

GerryW

Rest In Peace
Joined
Feb 14, 2021
Messages
1,688
Points
113
Location
Suffolk
First Name
Gerry
What a shame, all that work gone - don't let it get you down though, turn it around as a 'learning' experience :thumb2: ;) (whereas I'd probably try to salvage it and it'd look a right dogs dinner!)
 
  • Like
Reactions: JR

Jakko

Way past the mad part
SMF Supporter
Joined
Apr 28, 2018
Messages
10,797
Points
113
First Name
Jakko
Ah, too bad, it was looking very impressive. Shame it won’t get completed, but you live and learn, I suppose … Better luck with the next attempt :smiling3:
 
  • Like
Reactions: JR

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
Hi John
Rather shocked as you excel at this sort of thing. Having said that these things happen. Looking forward to the mk2 base which will no doubt be a stunner.
Jim
Thanks Jim, well not worth being upset, more to the point annoyed at the sealing being poor.

Bit of a bummer but know you well enough now to bounce back a pain after all the hours but hey from the ashes and all that. Dave
Indeed David. Can't win them all, the only good thing is I'd tried some new methods on the base which I shall use again at some point .

:poop::poop::poop: happens........
It does indeed Rick, thanks for the PM .:thumb2::smiling3:
Oh dear :tired: I was having a very enjoyable catch-up and getting all excited!
And now this!
The remains of the bridge looks fine as it is-hope you can incorporate it somehow.
Top stuff, John, in spite of the set-back!
Sorry to end the enjoyable catch up Neil .The bridge has gone to the , well the remains of it , to the large garden waste bin .
What a shame, all that work gone - don't let it get you down though, turn it around as a 'learning' experience :thumb2: ;) (whereas I'd probably try to salvage it and it'd look a right dogs dinner!)
Gerry hi , thanks for commenting, normally I would try to salvage the base, but with it not drying at all it was pointless continuing .

Ah, too bad, it was looking very impressive. Shame it won’t get completed, but you live and learn, I suppose … Better luck with the next attempt :smiling3:
You certainly do live and learn !
I could come back to it at some time using another KV 1 , which was indeed the tank in that photo .It's all a leaning curve at the end of the day .
Devastating mate, absolutely devastating.

You have the talent to rebuild it , you have the technology, you have the capability to build the first bionic base. John Race will be that man. Better than he was before, stronger, and faster than he has ever been!.

You have the power to rebuild it!
Steve thank you for the evangelistic comments, have you been drinking or sniffing the TXT again :smiling3::smiling3::smiling3::smiling3::smiling3:.
 

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
Sorry for your mishap, John. I'm sure that Base 2.0 will be as great as the 1.0 would have been and, possibly, will be in a future project, as the idea was brilliant.
Thanks Andrea, like all modelling a learning curve :smiling3:
 

spanner570

SALAD DODGER
SMF Supporter
Joined
May 26, 2009
Messages
12,988
Points
113
First Name
Ron
That's tough 453, but isn't that the 'Thing' with dioramas?

All going great then the proverbial hits the fan! I too have the 'T' shirt.

A bit annoying for you but onwards and upwards eh? Here's to the Mk.II

570
 

scottie3158

SMF Supporter
Joined
Apr 27, 2018
Messages
12,694
Points
113
Location
Spalding
First Name
Paul
John,
What a bummer and it was looking so good. I have had the "water" leak pass the seal as well. It is so frustrating after all the work that had gone in. I know you will not let this get to you and look forward to the solution.
 

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
That's tough 453, but isn't that the 'Thing' with dioramas?

All going great then the proverbial hits the fan! I too have the 'T' shirt.

A bit annoying for you but onwards and upwards eh? Here's to the Mk.II

570
Thanks 570, just one of those things, I need to really check out sealing the outsides before attempting any more "water " themes.
John,
What a bummer and it was looking so good. I have had the "water" leak pass the seal as well. It is so frustrating after all the work that had gone in. I know you will not let this get to you and look forward to the solution.
Yes Paul it is, like I said to you on fb. Think I was a little carefree in waiting. There will be another with water in but not yet.
 

JR

Member of the Rabble and Pyromania Consultant
SMF Supporter
Joined
May 26, 2015
Messages
17,275
Points
113
Location
lincs
First Name
John
Seeing Capitals are not allowed in titles will a mod please alter mine. I thought it was ok to use them in the description of the model.
 

Lee Drennen

Box Stock Builder with a Twist/ Rabble Member
SMF Supporter
Joined
Apr 29, 2018
Messages
5,649
Points
113
Location
Wortham Mo
First Name
Lee
Hi thought it was time I showed up with an update and a few photos.

I've been concentrating on the base, applying washes and some very fine green to emulate the green growth that you find on stones in a river. Not over done it, but just a hint.
After several additions followed by sprays of 3/1 IPA and a coat of very thin PVA heavily thinned with water and a drop of washing up liquid to aid the flow the whole base was allowed to dry for several days.

Tonight a spirt based coat of glass varnish was applied and is drying.

Yesterday I fired up the ab and sprayed some colour, wasn't very pleased afterwards with the finish as has a blockage of very dried paint in the nozzle which I had previously flushed though and it appeared fine. So for me a flush through doesn't appear to remove all the old paint.

At this point I brush coated the track guards, just brushed it on as it came esp as I was now fed up !
The turret had been done with the ab and at first I thought it was a complete mess. However leaving it all over night I'm more than happy with the finish, as to me it looks faded and has the primer showing though in places. The look I was after . I still need to put on the lockers, tow cables and the internals to the turret and to work on the overall look of the tracks as part of the front section will have been under water for the winter.

View attachment 448251View attachment 448252
Tonight after the sealing with the varnish.

View attachment 448253View attachment 448254
The KV its self.

View attachment 448255

Thanks for looking in.

John.
Looks real good John I like that paint on the KV.
 
  • Like
Reactions: JR
Top