Do you have trouble sleeping, find it hard to kip, read on folk's lol
Now Graf Spee is finished, full attention on KGV!
Will complete the rear superstructure Inc painting, PP and railings, finally getting to grips with ships being lots of models in one kit!
Removed, the kit doors, added PE ones, also removed the reels mounted on the sides, will replace with PE one's, finally drilled out portholes. Leaving the small hatches as they are.
The PE set includes ladders from the superstructure deck onto the upper secondary batterie deck. Had to drill and file a rectangular hole to allow fitment of the ladders.
They are in front of the round hole in the foreground. The general fit is poor so out with the Mr surfacer filler