Scratchbuilder
SMF Supporter
Update,
Will be thinning down the tie down on the rear stowage bin, that rope looks like it could hold the QE2 to the dock...
Tracks are now in primer/track primer and will be soon at the complete stage.
Decided to replace the stowage bin on the left side as the right side is now taken up with the new exhaust, exhaust pipe extension and soon the antennae stowage tube.
So first job was the new cover/lid with hinge detail and fasteners added....
The new stowage box from p/card with fastener hooks and second half of the hinge...
And the full box finished. The plate on the right is the water bottle carrier.
Cheers
Mike.
Will be thinning down the tie down on the rear stowage bin, that rope looks like it could hold the QE2 to the dock...
Tracks are now in primer/track primer and will be soon at the complete stage.
Decided to replace the stowage bin on the left side as the right side is now taken up with the new exhaust, exhaust pipe extension and soon the antennae stowage tube.
So first job was the new cover/lid with hinge detail and fasteners added....
The new stowage box from p/card with fastener hooks and second half of the hinge...
And the full box finished. The plate on the right is the water bottle carrier.
Cheers
Mike.