boatman
SMF Supporter
Excellent stuff,really taking shape now.
Piece of cake for a man of your talentYES she is Mark but ive now tomorrow got to try an get these bridges done an i will have to have good think an plan how i want these to light up an an spraying an then fitting windows glazeing an window wipers
chris
HI Mark i wish i had your confidence in me that you have got in me id build it with my eyes shut but no im not confident but i gota try an see how it goes an i will plan ahead for pro's an con's on them bridgesPiece of cake for a man of your talent
AN THANKS Andy yes she is looking good an sleek i cant wait till i can jion it togeather but still a lot to do before that can happenThat is going to be one good looker when it's all done.
Andy.
HI Andrew yes both main S/S are removeable as this is where the main power batts are an there will be two X 12v 12 amphr batts one in the front section under the main bridge S/S that will power the R/C R/X an all the servos on 6v via a drop down power reducer unit an all the lights an suchChris,
Yet again great to see her coming on.
Out of interest I was wondering how you move her around I've finished? Given her length. I can only sunny m assume it will be in two halves? If so how will you keep the two halves together in the water?
Will you take the deck and superstructure off and screw/clamp them together internally to keep it watertight?
Thanks again for sharing your progress.
Andrew
CHEERS Bob mate an glad you like the carry frames as this idea the ship is easy to carry around without fear of breakin the model bit like carryin a suitcase an yes the ships float as well lolLovely Chris, luv the carry frame !!
Always amazed by your work and they float as well
HI Gavin well the ship HMS TIGER that im building now is just over about 2 an a half yrs an still about 2yrs or so to go to finish as i started her in early 2019 if you look at the start of the build you will see the date of the build start an many thanks for your kind comments on my work very nice of you an thanks for lookin in on the build still a lot more to come thoughSuperb craftsmanship Chris, excellent work indeed. How long has this project taken you so far?
For FULL Forum access you can upgrade your account here UPGRADE