Hi Paul,E coming along well double deck be continuous run , my last permanent layout was like that , on two levels , love your back scene, did you paint it , I will have one back scene on my layout to cover track . TonyStill sorting out south end but finished laying out mine module & nailing down south inner grade loop violating grade std a bit to get under yard grade. Full stop. Have run out of rail connectors. Poor planning on my part. Thought I had stashed more. I should have used more "flex track" but instead used individual Atlas pieces for speed. So now have used up most of the Atlas tracks but have run out of connectors & have lots of flex-track left over. Duh.
View attachment 399151
You can see continuous run on far right holding to grade std. & the layout of yard & run-around connector before elevating it. In midframe is a pile of lumber to go to the chopsaw for elevating the yard/run-around connector.
View attachment 399152
north yard connector layout.
View attachment 399153
C&Cs encouraged. PaulE
For FULL Forum access you can upgrade your account here UPGRADE