Above kit photo was 2nd step of 9 on 4 pages of instructions. Brake lines are VERY delicate. Nice high quality kit. PaulE
WELL PaulE it looks like you have been busy I used to love doin al the rail road comin on great keep up the good workSome progress made. Here's the lower eastern loop tracks of folded dogbone connected to lower level benchwork.
View attachment 370322
West 1 lower level trackage & lower to upper level grade WIP.
View attachment 370323
The tunnel portal position shows how the upper & lower levels will be defined as the mainline & passing tracks will enter the industrial/maint. section over it.
View attachment 370324
C&Cs encouraged.
OK PaulE im following this build as railways have always got me intrested great layoutThanks for looking. Loose equipment & hotbox sensors are in right foreground. "Hotbox" is a wheel bearing overheating. When trouble is detected the warning light goes off & a signal is sent to dispatch to halt the affected train. The grey boxes are 'relay cabinets' to contain controls for them. PaulE
For FULL Forum access you can upgrade your account here UPGRADE